Inspections and project handovers at airports

You check a work package in a terminal. For airside assignments, the arrangements for access and recording are part of the preparation.

Request a demo
Inspector checking a wall finish in a terminal

What matters in this sector

Many parties are involved in a project handover at an airport: client, main contractor, suppliers. Punch list items get lost when everyone keeps their own list.

With Maintainspect the project manager records each item on site with a photo and a description and shares one list with all parties. At the next handover they check the same items and update the status.

Assignments you use it for

  • Handover of a work package in the terminal
  • Checking punch list items after repair
  • Baseline survey of plant rooms

What do you look for during the inspection?

  • Floors and wall finishes
  • Doors and passages
  • Plant rooms

A question from practice

Is the item really resolved? At the next handover, check the same list and update the status per item, so the main contractor and the supplier see the same thing.

How you record it

  1. 01

    Photo of the wall finish

    Take the photo and record what it is and what condition it is in. The finding is filed under Terminal, zone B.

  2. 02

    Record the location

    Do you have a drawing? Tap the spot where you are standing. Without a drawing you pick or type the location, for example Terminal, zone B.

  3. 03

    Check and report

    The overview shows what is still open, for example under floors and wall finishes. Then you share the report.

Schematic view of the tool.

Related sectors

Discuss your inspection

Tell us which locations and components you inspect. We will show how that works in the tool.