All sectors

Underground infrastructure and sewers

Inspections of cables, pipes and sewers

At a pipeline handover you record what is visible before the trench is closed, linked to the right part of the route.

Request a demo
Inspector noting the position of cables and pipes in an open trench

What matters in this sector

What lies in a trench can no longer be seen once it is backfilled. Anyone who later wants to know how cables and pipes run depends on what was recorded during construction.

With Maintainspect you record per route section and construction phase what lies in the open trench, with a photo and a position on the route drawing. At handover you have a picture per section of the situation before closing.

Assignments you use it for

  • Recording before the trench is closed
  • Handover per route section
  • Inspection of manholes and pipe sections

What do you look for during the inspection?

  • Open trenches
  • Manholes
  • Pipe sections

A question from practice

What was there before the trench was closed? Afterwards it can no longer be seen. Record per route section and construction phase what lies there, with a photo.

How you record it

  1. 01

    Photo of the pipes in open trench

    Take the photo and record what it is and what condition it is in. The finding is filed under Route section 4, phase 2.

  2. 02

    Record the location

    Do you have a route drawing? Tap the spot where you are standing. Without a drawing you pick or type the location, for example Route section 4, phase 2.

  3. 03

    Check and report

    The overview shows what is still open, for example under open trenches. Then you share the report.

Schematic view of the tool.

Related sectors

Discuss your inspection

Tell us which locations and components you inspect. We will show how that works in the tool.

Request a demo