You check a work package in a terminal. For airside assignments, the arrangements for access and recording are part of the preparation.
Request a demo
What matters in this sector
Many parties are involved in a project handover at an airport: client, main contractor, suppliers. Punch list items get lost when everyone keeps their own list.
With Maintainspect the project manager records each item on site with a photo and a description and shares one list with all parties. At the next handover they check the same items and update the status.
Assignments you use it for
- Handover of a work package in the terminal
- Checking punch list items after repair
- Baseline survey of plant rooms
What do you look for during the inspection?
- Floors and wall finishes
- Doors and passages
- Plant rooms
A question from practice
Is the item really resolved? At the next handover, check the same list and update the status per item, so the main contractor and the supplier see the same thing.
How you record it
01
Photo of the wall finish
Take the photo and record what it is and what condition it is in. The finding is filed under Terminal, zone B.
02
Record the location
Do you have a drawing? Tap the spot where you are standing. Without a drawing you pick or type the location, for example Terminal, zone B.
03
Check and report
The overview shows what is still open, for example under floors and wall finishes. Then you share the report.
Related sectors

Rail and stations
Handover per platform, station zone or track section

Real estate and buildings
Office handover per floor, room and punch list item
Discuss your inspection
Tell us which locations and components you inspect. We will show how that works in the tool.
Request a demo