Underground infrastructure and sewers
Inspections of cables, pipes and sewers
At a pipeline handover you record what is visible before the trench is closed, linked to the right part of the route.
Request a demo
What matters in this sector
What lies in a trench can no longer be seen once it is backfilled. Anyone who later wants to know how cables and pipes run depends on what was recorded during construction.
With Maintainspect you record per route section and construction phase what lies in the open trench, with a photo and a position on the route drawing. At handover you have a picture per section of the situation before closing.
Assignments you use it for
- Recording before the trench is closed
- Handover per route section
- Inspection of manholes and pipe sections
What do you look for during the inspection?
- Open trenches
- Manholes
- Pipe sections
A question from practice
What was there before the trench was closed? Afterwards it can no longer be seen. Record per route section and construction phase what lies there, with a photo.
How you record it
01
Photo of the pipes in open trench
Take the photo and record what it is and what condition it is in. The finding is filed under Route section 4, phase 2.
02
Record the location
Do you have a route drawing? Tap the spot where you are standing. Without a drawing you pick or type the location, for example Route section 4, phase 2.
03
Check and report
The overview shows what is still open, for example under open trenches. Then you share the report.
Related sectors

Road construction and paving
Road survey per section or handover of asphalt and markings

Energy and utilities
Handover of installations at a charging hub or solar park
Discuss your inspection
Tell us which locations and components you inspect. We will show how that works in the tool.
Request a demo