Rail and stations
Inspections at stations and around rail projects
During a platform handover you walk the agreed zones and record punch list items per component.
Request a demo
What matters in this sector
A platform or station zone is long and has many repeating elements. A punch list item without a position costs more time searching than fixing.
With Maintainspect you walk the agreed zones and put each item on the drawing. The contractor gets one list with photos and positions; at the next round you check the same items.
Assignments you use it for
- Handover per platform or zone
- Inspection round of station facilities
- Survey before works start
What do you look for during the inspection?
- Platform paving
- Canopies
- Station facilities
A question from practice
Which zone is the item in? On a platform hundreds of metres long, the position on the drawing is the difference between searching and fixing.
How you record it
01
Photo of the platform paving
Take the photo and record what it is and what condition it is in. The finding is filed under Platform 2, zone C.
02
Record the location
Do you have a drawing? Tap the spot where you are standing. Without a drawing you pick or type the location, for example Platform 2, zone C.
03
Check and report
The overview shows what is still open, for example under platform paving. Then you share the report.
Related sectors

Airports
Project handover in a terminal or an assignment airside

Bridges, tunnels and hydraulic structures
Inspection of concrete, bridge joints, retaining walls or tunnel installations
Discuss your inspection
Tell us which locations and components you inspect. We will show how that works in the tool.
Request a demo